Skills

Play Billing Library Version Upgrade

Use this skill when upgrading or migrating an Android project from any legacy Google...

Install

npx skills add android/skills --skill play-billing-library-version-upgrade -g -a claude-code -y
Repository
android/skills10.2k
Category
Mobile
Updated
6d ago
License
Complete terms in LICENSE.txt
Context cost
Lightabout 1,300 tokens
Runs scripts
No, instructions only

What it does

Use this skill when upgrading or migrating an Android project from any legacy Google Play Billing Library (PBL) version to the latest stable version of PBL.

Phase 0: Intent Message

Reporting Action: Before proceeding, immediately tell the user: "I will upgrade Play Billing Library to the latest version."

Phase 1: Discovery & Situational Awareness

  1. Primary Check (Build Version) : Locate the project's billing dependency (e.g., com.android.billingclient:billing) in build.gradle, build.gradle.kts, or libs.versions.toml.
  2. Initial Compilation Test: Attempt to sync and build the project immediately.
  3. Fallback Discovery (Effective Version) :
    • Trigger: Only if the build fails immediately, scan the source code for deprecated artifacts.
    • Logic : The presence of deprecated APIs indicates the "Effective Version" ---defined as the version where those specific APIs were last available, not when they were introduced.
    • Example : If SkuDetails is present, treat the baseline as PBL v7 or earlier (regardless of the version string in build.gradle).
  4. Identify Target & Path : Access the version tool or release notes to find the latest stable version and calculate a [Direct/Stepped] migration path based on the Effective Version baseline.
  • Calculate Migration Path :
    • If the Effective Version is within 2 major versions of the target: Plan a Direct Migration.
    • If it is more than 2 major versions behind: Plan a Stepped Migration. Migrate by two major versions at a time (e.g., v4 -> v6 -> v8) until you are within two versions of the target.
  • Reporting Action: Before proceeding, tell the user: "I've detected you are effectively on PBL [Current] and the latest is [Target]. I am planning a [direct/stepped] migration path."

Phase 2: Contextual Document Mapping & Planning

For every major version jump identified in your path, you MUST synthesize instructions from:

Read the whole SKILL.md on GitHub

More in Mobile