Skills

Create Stories

Breaks one epic into implementable stories with acceptance criteria.

Install

npx skills add Donchitos/Claude-Code-Game-Studios --skill create-stories -g -a claude-code -y
Category
Design
Updated
17d ago
License
MIT
Context cost
Mediumabout 3,000 tokens
Runs scripts
No, instructions only

What it does

Breaks one epic into implementable stories with acceptance criteria. Use when the user wants stories for an epic or the next batch of work to build. Not for turning the whole design into epics.

!bash "${CLAUDE_SKILL_DIR}/../../hooks/yaml-helper.sh" resolve_config --keys review_mode,review_gate,automation,workflow,docs.density,story_granularity,qa.level,system_overrides

Resolved above, use as-is; --review overrides review_mode. No block → defaults in .claude/docs/config-resolution.md.

Ask with the question tool. Without one, list the options numbered and end your turn to wait. A skipped or dismissed question is not an answer: ask again in plain text.

Create Stories

A story is one implementable behaviour: small enough for the size story_granularity sets, self-contained, and traced to a requirement and the decision that governs it. Run this skill once per epic, in dependency order: Foundation epics first, then Core, Feature, Presentation.

Writes: production/epics/[epic-slug]/story-NNN-[slug].md, the epic's EPIC.md Stories table, and its row in production/epics/index.md. Next: /dev-story [story-path] at workflow: minimal; otherwise /story-readiness [story-path], then /dev-story.

Asks follow .claude/docs/automation-modes.md (collaborative always asks, guided asks on major choices, autonomous logs and goes on; automation_always_ask categories always ask).

Checklist (copy it and tick as you go):

- [ ] Phase 1: epic found, tier resolved
- [ ] Phase 2: inputs loaded, each ADR's status reported
- [ ] Phase 3-4: stories drafted, typed, Ready or Blocked
- [ ] Phase 5: QA lead review run, or its skip noted
- [ ] Phase 6: story list shown, one ask to write
- [ ] Phase 7: stories, EPIC.md and index.md written (or index absence said)
- [ ] Phase 8: next step asked, closing block printed

Phase 1: Epic and settings

Tier. workflow for the epic's system: the system_overrides row for the epic slug (its GDD system) if there is one, else the project value.

story_granularity sets each story's acceptance-criteria load. Group or split criteria to hit it:

Read the whole SKILL.md on GitHub

More in Design