Skills

Work Circleback Action Items

Work the action items Circleback captured, find what is assigned to this user, do the...

Install

npx skills add ParadevAI/Paradev --skill work-circleback-action-items -g -a claude-code -y
Repository
ParadevAI/Paradev15.8k
Category
Engineering
Updated
3d ago
License
See repository
Context cost
Lightabout 536 tokens
Runs scripts
No, instructions only

What it does

Work the action items Circleback captured, find what is assigned to this user, do the ones the workspace can do, and update status only for work that is actually finished. Use when the user asks what they owe, "do my action items", "what's still open from", or wants to close, reassign, or add an action item.

Work the action items

Circleback turns meetings into action items with an owner and a status. The job is to work the ones that belong to this user, and to keep the list true: an item is done when the work is done, not when it is convenient.

1. Start from the assignee, not the search box

SearchActionItems with status PENDING returns the user's own open items. For someone else's, resolve them with FindProfiles and pass their profile ID. Filter by date range or tags when the user scopes the request ("from this week's customer calls"), and read the linked meeting with ReadMeetings when an item's title does not say enough to act on.

2. Sort each item by what the workspace can do

  • A code change, make it here, open it for review, and cite the meeting.
  • A ticket or issue, file it through the connected tracker with the item's wording and the meeting in the body.
  • A message or reply, draft it; never send unless the user asked for exactly that.
  • Something outside the workspace, leave it open and say so.

3. Update status only for finished work

UpdateActionItem to DONE after the change is merged, the ticket exists, or the user confirms they did the part you could not. Reassign only when the notes make the real owner clear or the user asks. CreateActionItem only when the user asks for a new one; a follow-up you discovered goes in your report first.

4. Report the list

One line per item: what it was, what you did (changed, filed, drafted, left open and why), and the meeting it came from. Items that turned out stale, done in a later meeting, or superseded, are worth pointing out rather than quietly closing.

Anti-patterns

Read the whole SKILL.md on GitHub

More in Engineering