Skills

Thinking Lindy Effect

Use when longevity of a non-perishable option matters.

Install

npx skills add tjboudreaux/cc-thinking-skills --skill thinking-lindy-effect -g -a claude-code -y
Category
Engineering
Updated
3mo ago
License
MIT
Context cost
Lightabout 590 tokens
Runs scripts
No, instructions only

What it does

Use when longevity of a non-perishable option matters. Treat survival duration as a remaining-life prior, then check domain drift before favoring the proven.

Lindy Effect

For non-perishable ideas, technologies, and practices, expected remaining life scales with current survival age. Prefer proven survivors unless the new option clears a burden of proof or the domain has drifted.

When to Use

  • Choosing languages, frameworks, databases, protocols, patterns, or dependencies where long-term survival matters.
  • Skill or architecture bets whose value depends on lasting relevance.
  • Ranking options when ages differ materially and the choice outlives a short experiment.

When NOT to Use

  • Perishable targets: specific SaaS vendors, hardware, fashion, or products that can shut down regardless of concept age.
  • Active paradigm discontinuity where age in the old regime is weak evidence.
  • Throwaway work where longevity is irrelevant, optimize for fit and speed.
  • Treating "older" as "optimal for a new requirement"; survival predicts further survival, not best fit.

Procedure

  1. Confirm non-perishable scope. Concept/tech/practice continues; vendor/device → score fit/risk only and stop.
  2. Record survival age. First significant production use and current age (ecosystem-relative if the ecosystem is young).
  3. Form the Lindy prior. Expected remaining life ≈ current age; mark confidence from age and continued active use.
  4. Run domain-drift checks. Problem class changed? Paradigm shift invalidating old assumptions? New option uniquely closes a real present gap?
  5. Assign burden of proof. Default to the older adequate option. Accept newer only for a stated necessary advantage the Lindy option cannot meet at acceptable cost.
  6. Decide with residual risk. Pick primary; note impact if the prior is wrong and any fallback.

Stop condition: Primary chosen with age prior, drift check, and why new did or did not meet burden of proof.

Output

Read the whole SKILL.md on GitHub

More in Engineering